Code weights and where they go
Code 4 lead for most step and cover flashings, code 5 for valleys, soakers and back gutters where the lead works harder. Using too thin a code is one of the most common reasons lead work fails early.
Roofing service
Code specified lead flashings, valleys, chimneys, bays and parapets, formed and dressed on site.
In short. Lead is where most roofs leak and where most corners get cut. AM Roofing Services Ltd forms lead work to the correct code and bay length for the detail, with proper welts, clips, expansion allowance and chases raked and pointed. We cover chimney flashings, valleys, box gutters, bay roofs, dormer cheeks, parapets and abutments on both period and new build properties.
AM Roofing Services Ltd has traded for 20 years and is NFRC Registered and Constructionline Gold certified. Operatives are CSCS carded, NVQ qualified and first aid trained, and we carry £10m public and employers liability insurance. You get a written quotation, a planned programme, daily site photographs and completion documentation at handover.
Call 01296 325155 or request a survey and we will come and look at the roof.
How we do it
Code 4 lead for most step and cover flashings, code 5 for valleys, soakers and back gutters where the lead works harder. Using too thin a code is one of the most common reasons lead work fails early.
Lengths kept within the limits that stop thermal movement tearing the lead, laps and drips formed correctly, and every piece fixed and clipped so wind cannot lift it. Chemical fixings and mastic are never used where the lead should be dressed and wedged.
Chimney flashings and back gutters, lead valleys, bay window roofs, dormer cheeks and parapet gutters. Where existing lead has cracked, we renew the whole detail rather than patching one section.
Local coverage
We deliver this service across the whole coverage area. Choose your town for local detail.
Two fields, no long form. A roofer will call to talk it through and arrange a survey if you want one.
Or call 01296 325155Questions
Something not covered here? Call 01296 325155 and you will speak to a roofer, not a call centre.
The most common causes are lead that was surface sealed rather than chased in, undersized lead code, and missing soakers behind the flashing. All three need the detail forming again properly rather than resealing.
Yes, and we can fit security markings and alternative code specified materials where theft is a recurring problem in the area.
Yes. Traditional lead detailing on period property is core work for us, and we document methods and materials for conservation officers where that is required.
Related

Contractor grade roofing for commercial and public sector projects, with full documentation and site records.

Roofing packages for developers and self builders, delivered to programme with full site documentation.

Complete roofing packages for developers and main contractors, priced from drawings and delivered to programme.
Let's talk
Book a survey with an NFRC registered contractor. You get a written quotation, a clear programme and one company accountable for the whole job.
Discuss your project