Replacement, not capping
We remove the old timber fascias and soffits rather than covering them, because capping over rot hides the problem and lets it spread into the rafter ends.
Roofing service
Full roofline replacement in UPVC with correct ventilation, replacing rotten timber and failed boards.
In short. Roofline work is not just cosmetic. Rotten fascias let water behind the gutter and into the wall plate, and boarded over soffits without ventilation trap moisture in the roof space. AM Roofing Services Ltd strips old timber back, replaces defective rafter feet and wall plate where needed, then fits new fascias, soffits, bargeboards and cladding with ventilation built in.
AM Roofing Services Ltd has traded for 20 years and is NFRC Registered and Constructionline Gold certified. Operatives are CSCS carded, NVQ qualified and first aid trained, and we carry £10m public and employers liability insurance. You get a written quotation, a planned programme, daily site photographs and completion documentation at handover.
Call 01296 325155 or request a survey and we will come and look at the roof.
How we do it
We remove the old timber fascias and soffits rather than covering them, because capping over rot hides the problem and lets it spread into the rafter ends.
New soffits are ventilated where the roof needs it, and eaves carrier trays are fitted so the membrane drains into the gutter rather than onto the fascia board.
Replacement in uPVC in white, black, grey or woodgrain, with new guttering fitted at the same time so the whole roofline is renewed together and properly aligned.
Local coverage
We deliver this service across the whole coverage area. Choose your town for local detail.
Two fields, no long form. A roofer will call to talk it through and arrange a survey if you want one.
Or call 01296 325155Questions
Something not covered here? Call 01296 325155 and you will speak to a roofer, not a call centre.
Capping over rotten timber hides the problem and traps moisture. We strip back to sound timber, repair what needs repairing, and fit new boards to a proper substrate.
A typical semi detached or detached home takes two to four days once scaffold is up, including guttering renewal.
Yes. Without continuous ventilation at eaves level, warm moist air condenses in the roof space and damages timbers and insulation. Ventilation is built into every roofline installation we carry out.
Related

Contractor grade roofing for commercial and public sector projects, with full documentation and site records.

Roofing packages for developers and self builders, delivered to programme with full site documentation.

Complete roofing packages for developers and main contractors, priced from drawings and delivered to programme.
Let's talk
Book a survey with an NFRC registered contractor. You get a written quotation, a clear programme and one company accountable for the whole job.
Discuss your project